
Demolition Solutions for Every Home
From emergency calls to scheduled maintenance, our demolition team delivers quality work on time and on budget.
Våra Tjänster
Professionella demolition-tjänster anpassade efter dina behov.
Complete Structure Demolition
Full demolition of residential, commercial, and industrial structures including permits, utility disconnection, and environmental compliance.
- Residential, commercial, and industrial buildings
- All permits and utility disconnections handled
- Complete site clearing and debris removal
Selective Interior Demolition
Surgical removal of specific interior elements — walls, floors, ceilings, and mechanical systems — while preserving the rest of the structure for renovation.
- Wall, floor, and ceiling removal
- Mechanical, electrical, and plumbing removal
- Dust and debris containment for occupied buildings
Concrete & Asphalt Removal
Breaking, removal, and hauling of concrete foundations, slabs, driveways, sidewalks, and asphalt parking lots with recycling of reusable materials.
- Hydraulic breaker and saw-cutting capabilities
- Material recycling to reduce disposal costs
- Subgrade preparation after removal
Asbestos & Hazmat Abatement
Licensed asbestos, lead paint, and hazardous material testing, removal, and disposal in full compliance with EPA and state environmental regulations.
- Licensed and certified abatement crews
- Full EPA and state regulatory compliance
- Air monitoring and clearance testing
Pool & Spa Demolition
In-ground pool removal including concrete breaking, debris hauling, backfill, compaction, and grading. Partial and full removal options available.
- Full removal and partial (punch-and-fill) options
- Proper backfill, compaction, and grading
- Permit handling and inspection coordination
Emergency Demolition
Rapid response demolition for fire-damaged, storm-damaged, or structurally condemned buildings that pose immediate safety hazards.
- Rapid mobilization for safety hazards
- Coordination with fire marshal and code enforcement
- Insurance documentation and support
Om Norrköping Demolition
At Norrköping Demolition, we've been proudly serving Norrköping since 2020. Founded by David Davis, our team is dedicated to providing exceptional demolition services. We believe in honest work, fair pricing, and building lasting relationships with our customers.

Före & Efter
Se de förvandlingar vi levererar åt våra kunder.


Kitchen Renovation
Complete kitchen demolition overhaul with modern fixtures and finishes.


Bathroom Upgrade
Outdated bathroom transformed into a modern, functional space.
Serviceområde
Vi betjänar stolt dessa områden och omgivningar.
Områden Vi Betjänar
Vårt Arbete
Se exempel på vårt arbete inom demolition.






Få en Snabb Uppskattning
Välj tjänstetyp och projektomfattning för ett snabbt prisintervall.
Uppskattat Prisintervall
3 500 kr – 9 000 kr
Slutpriset beror på specifika krav
Senaste Artiklarna
Expertinsikter, tips och nyheter från vårt demolition-team.
Pool RemovalFull vs. Partial Pool Removal: Which Should You Choose?
Full removal costs more but leaves a buildable lot. Partial removal is cheaper but limits future use. We explain the pros and cons of each approach.
Läs Mer →
SafetyWhat You Need to Know About Asbestos Before Renovating
If your building was constructed before 1980, it likely contains asbestos. Here's where it hides, when it's dangerous, and what to do about it.
Läs Mer →
EducationThe Demolition Process: From Permit to Clean Lot
A step-by-step walkthrough of what happens during a demolition project, from initial survey to final grading and inspection.
Läs Mer →
SustainabilityDemolition vs. Deconstruction: Can You Save the Materials?
Deconstruction salvages reusable materials like lumber, fixtures, and brick. It costs more in labor but saves on disposal and may qualify for tax deductions.
Läs Mer →How to Prepare Your Property for Demolition Day
Utility disconnections, neighbor notifications, and personal property removal — here's your checklist for the days leading up to demolition.
Läs Mer →Problem Vi Löser
Vanliga utmaningar våra kunder möter — och hur vi hjälper.
Need a building torn down but worried about permits and regulations?
Demolition involves permits, utility disconnections, environmental assessments, and disposal regulations. We handle every step from application to final grading so you stay in compliance.
Is your renovation project stalled because of hazardous materials?
Buildings constructed before 1980 often contain asbestos, lead paint, or other hazardous materials. Our licensed abatement team removes these materials safely and legally before renovation work begins.
Want to remove an old pool but keep the rest of the yard intact?
Pool removal requires careful planning — permits, utility disconnection, concrete breaking, hauling, backfill, and compaction. We handle the entire process and leave you with a graded, usable yard.
Is a condemned building on your property creating liability?
Condemned structures are safety hazards and liability magnets. Quick demolition and site clearing eliminates the risk and opens the property for new development or sale.
Trying to renovate but need interior elements removed without damaging the structure?
Selective demolition requires precision and experience. We remove exactly what needs to go — walls, floors, mechanical systems — while protecting the structural elements and finishes you want to keep.
Vanliga Frågor
Har du frågor? Vi har svaren.
Do I need a permit for demolition?
Yes, virtually all demolition work requires a permit, even for interior work in some jurisdictions. We handle all permit applications, submit required documentation, and schedule inspections throughout the process.
How do you handle asbestos and hazardous materials?
We perform or commission a hazardous materials survey before demolition begins. If asbestos, lead, or other hazardous materials are found, our licensed abatement team removes them in compliance with EPA and state regulations before demolition proceeds.
What happens to the demolition debris?
We sort and recycle as much material as possible — concrete, metals, wood, and asphalt. Non-recyclable waste goes to approved landfills. Recycling reduces both your disposal costs and environmental impact.
How long does a typical residential demolition take?
A standard house demolition takes 1-3 days for the actual teardown. Add 1-2 weeks for permits, utility disconnections, and hazmat surveys. Total timeline from start to graded lot is typically 2-4 weeks.
Vad Våra Kunder Säger
Ta inte bara vårt ord för det — hör från våra nöjda kunder.
“Demolished a fire-damaged commercial building on a tight downtown lot with zero damage to the adjacent buildings. Surgical precision with heavy equipment.”
James Garcia
“Removed our old in-ground pool, backfilled, compacted, and graded the yard. Three weeks later we had sod down and you'd never know a pool was there.”
Maria Miller
“Found asbestos during our office renovation. They brought in the abatement crew, handled it properly, and we were back on track within a week. No drama, just professional work.”
David Davis
“They did selective demo on our 100-year-old building, removing everything down to the studs while preserving the original brick walls and timber beams. Exactly what we needed for the renovation.”
Lisa Rodriguez
Kontakta Oss
Redo att börja? Kontakta oss idag för en gratis konsultation och offert.
Telefon
+46 76 448 88 76
E-post
Adress
448 Main Street, Norrköping